| 0035 | Fill N2 cold trap full. |
| | Fed Cricket 3 pellets. |
| | Mixing chamber temperature 4.91 K and falling. 1 K pot temperature 4.5 K. |
| 1005 | Fed Cricket 3 pellets. |
| 1030 | Filled LN2 cold trap. |
| 1245 | Start helium transfer. Helium liquid level 0.7%. |
| 1335 | Stop helium transfer. Helium liquid level 72.3%. |
| 2235 | Mixing chamber temperature 6.97 K and rising slowly. Helium leak rate in pipes leading to IVC 1.2E-9 mbar l/s. Open up IVC and helium leak rate rises to 1.5E-6 mbar l/s. There doesn't appear to be an increase from running the 1 K pot. |
| | Isolate IVC and leak checker. Pump out lines to IVC with turbo pump. |
| 2245 | Start cryocleaning mixture through nitrogen cold trap 2. Fill N2 cold trap partially full. |
| 2340 | Fill N2 cold traq full. |
| | Fed Cricket 4 pellets. |