| 0025 | Start cryocleaning mixture through nitrogen cold trap 1. Fill N2 cold trap full. |
| 0954 | Fill LN2 cold trap full. |
| | Fed Cricket 3 pellets |
| 1140 | Pump mixture into dump in preparation for cleaning cold traps. |
| 1320 | Extract cold traps from helium and nitrogen reservoirs. Start cleaning cold traps. |
| 1455 | Finished cleaning cold traps (3 cycles). Wait for them to cool down. |
| 1532 | Leak check. Leak rate: 3.6E-6 cc/s. |
| 1625 | Returned cold traps to proper positions. Filled LN2 cold trap. Begin cryocleaning. |
| 1710 | Begin LHe transfer (5.8%). |
| 1738 | Started 1K pot but accidentally left IVC open. Stop 1K pot. Continue evacuating IVC. |
| 1800 | End LHe transfer (91%). |
| 1805 | Fed Cricket 4 pellets. |
| 1856 | Start pumping on the 1 K pot with needle valve closed to get rid of LHe inside. |
| 1859 | Closed big speedivalve to stop pumping on th 1 K pot. |