2012/08/19
| 0515 | Fed Cricket (4 pellets). |
|---|---|
| 0610 | Fill N2 cold trap full. |
| 1655 | Fed Cricket 5 pellets. |
| 1710 | Dump pressure before He-4 gas transfer 597 mbar. Dump pressure after He-4 transfer 695 mbar. |
| Fill N2 cold trap full. Start cryocleaning mixture through nitrogen cold trap 2 (valve 6 open 12.0%). | |
| 1725 | Open valve 6 to 13.0%. |
| 1736 | Begin LHe transfer. (12.0%) |
| 1835 | End LHe transfer (49.3%). Not sure why this is so low. |