Table of Contents
2012/08/06
| 0952 | Fed Cricket 3 pellets. |
|---|---|
| 1045 | Filled LN2 cold trap. |
| 1642 | Fed Cricket 4 pellets. |
| 1745 | Filled LN2 cold trap. |
| 1834 | Could not read any charge signal from the DCRC33. Found it was put on an empty connector on ebox. |
| 1909 | Labeled the connectors correctly. Put DCRC33 on DIB 1 and DCRC32 on DIB 2. Could not establish data link with DCRC32. |
| 1911 | Connection made to DCRC32. |
| 1925 | Taking data 07120806_1925_F0001. DIB1/DCRC33=-2V, DIB2/DCRC32=+2V. Trace length 0.4096ms, pre-trigger 100us. Trigger on (Qi/DIB1, Qo/DIB1, Qi/DIB2, Qo/DIB2) at (56, 40, 32, 32) ADC bin. Data/flash/cooldown = 30/0.1/20/min. Ba-133 source is ~2 inches below top of mu metal shield. MC H35=79.1mK. Will take 3 series at this bias and then take data with same settings at DIB1 = -4, -6, -8, -10, -12, +2, +4, +6, +8, +10, +12V, and DIB2=-DIB1 bias. |







