Table of Contents
2012/07/24
| 0855 | Filled LN2 cold trap. |
|---|---|
| 0925 | Fed Cricket 3 pellets. |
| 1215 | Begin LHe transfer (3.9%). |
| 1222 | Stopped data taking, but it was during 0V collection mode and it was going to flash after. Started flashing detector via detector control vi. |
| 1315 | End LHe transfer (86.2%). |
| 1805 | Filled LN2 cold trap. |
| 1805 | Fed Cricket 4 pellets. |
DCRC 31 P gain: 20 x 4 x [1-7] Qi 0x207e 0.2mV Qo 0x2081 0.5mV
| 2015 | ZAP SQUIDs on DIB1 and DIB2 twice. |
|---|---|
| 2044 | Could not power up or communicate with DCRC32 through the switch with a regular cable between them. Replace the regular Ethernet cable with the crossover cable and the problem disappeared. |
| 2129 | Zapped all SQUIDs twice after cycling the power. |
| 2140 | DCRC32 looked fine after loading the settings. DCRC33 seemed to have a lot trapped flux. Zap SQUIDs on DCRC33 twice in a row. |
| 2334 | Started taking data 07120724_2334_F0001. DIB1/DCRC33=+2V, DIB2/DCRC32=-2V. Trace length 3.2768ms. Pre-trigger 400us. Data/flash/cooldown = 2hour/6s/20min. Will take DIB1/2=-/+2V, +/-4V, -/+4V, +/-6V, -/+6V. With Ba-133 source. QET bias as in 20120723 |
Data Set 07120724_0011 with Ba-133 & Am-241 and DIB1 -2 V, DIB2 +2 V
Data Set 07120724_0232 with Ba-133 & Am-241 and DIB1 +4 V, DIB2 -4 V
Data Set 07120724_0454 with Ba-133 & Am-241 and DIB1 -4 V, DIB2 +4 V
Data Set 07120724_0716 with Ba-133 & Am-241 and DIB1 +6 V, DIB2 -6 V
Data Set 07120724_0938 with Ba-133 & Am-241 and DIB1 -6 V, DIB2 +6 V
An error occurred for this data set where Qi and Qo died for Zip 2. This can be seen clearly in Figure 18. This did not occur for any of the other voltage biases.
A look at the raw pulses verifies that this is not just an issue with the ROOT code. Notice that Qi and Qo are present in Zip 1, but not in Zip 2. This is consistent in the other events.


























