UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20120710

2012/07/10

0931 G1=72mbar, G2=64mbar. 1K pot=1.837K. P2=1000mbar, P1=1000mbar, MC=2.1K. Stop condensing. Start circulation
1015 Fed Cricket (3 pieces)
1030 Filled LN2 cold trap.
1032 Abort circulation sequence. MC H35=93mK. 1K pot = 1.841K.
1054 Set 1K pot to 1.5K. Pushed the He cold trap pass the G10 plate. The quick coupling nut can not be fully tightened because the He cold trap is bent. Need to straighten it.
1400 Measure resistances and temperatures. Mixing chamber temperature: 62.9 mK
1815 Fed Cricket (4 pieces).
Table 1: Temperature of Stages.
Stage Measured Resistance [kΩ]
Still 4.5
Cold plate 14.5
Mixing chamber 32.1
Table 2: DIB 2, DCRC 33
Phonon Channel SQUID Bias (micro A) Lockpoint (mV) Modulation Depth (mV) QET Bias (uA) Front End Gain Comment
A 68.35 3.50 4.6 -65 (NI) 2.5
B 68.35 1.85 3.3 -105 (NI) 3.2
C 85.92 3.79 4.7 -567 (NI) 3
D 96.66 3.60 4.3 -90 (I) - 1.5 Front end gain?
Table 3: DIB 3, DCRC 30
Phonon Channel SQUID Bias (micro A) Lockpoint (mV) Modulation Depth (mV) QET Bias (uA) Front End Gain Comment
A 64.45 3.99 3.5 -130 2.8
B 71.28 5.25 4.7 -110 4.2 Driver Offset = 1.08
C 85 4.38 4.4 -140 3
D 82.02 2.72 4.8 -140 2.6