2012/06/28 1100 Filled LN2 cold trap. 1635 Start evacuating dewar with turbo pump. 2135 Start tower assembly procedure. Figure 1: G103a Side 2. White spots on surface to do with scratches from polishing. Shouldn't create any problems as detector with similar surface went to Soudan.