2012/06/01

0945 Filled LN2 cold trap.
1140 Did leak check with helium spray test. Background rate: 2.2E-9 mbar l/s. After leak checking lower flange: 2.36E-9 mbar l/s. No gross leak.
1600 Pumped and flushed main bath.
Evacuated 1 K pot.
Filled IVC with 4.6 mbar of N2 exchange gas.
1620 Begin LN2 transfer
1900 Stop nitrogen transfer.
1920 Fill N2 cold trap full. Close condenser line speedivalve and gate valve. Start cryocleaning mixture through nitrogen cold trap 2 (13.2%)