1500 Conduct tower level continuity checks. All wires except Qi bias & QET Return A pass continuity checks.
Table 1: Tower Level Continuity Checks.
Side Coax ZB1-1-9 Flexible v4
Tower Face 5 2
Qi feedback - Qi gate 26 nS 13 nS
Qi gate - Qi bias <0.2 nS <0.2 nS
Qi gate - ground - <0.3 nS
Qi bias - QET return D <0.2 nS <0.3 nS
Qi bias - ground - <0.2 nS
Qo feedback - Qo gate 25 nS 13 nS
Qo gate - Qo bias <0.2 nS <0.2 nS
Qo gate - ground - <0.2 nS
Qo bias - QET return D <0.2 nS <0.3 nS
Qo bias - ground - <0.1 nS
No shorts to ground!
1530 Commence tower installation procedure.
2030 Everything looks good from room temperature electrical checks.
2230 Conclude tower installation procedure. Start evacuating IVC.
2300 Filled LN2 cold trap.