2012/05/11
| 0025 | Fill N2 cold trap full. |
|---|---|
| Close condenser line speedivalve and gate valve. Resume cryocleaning mixture through nitrogen cold trap 2. | |
| 1325 | Fill N2 cold trap full. |
| 1400 | Start 1 K pot. |
| Pump mixture into dump in preparation for condensation. Start condensing mixture through nitrogen cold trap 1. | |
| 1720 | Mixture has condensed. Start circulating mixture. |
| 1830 | Valve 6 fully open and most of the mixture has been bled from the dump. Let's see what base temperature we achieve… |