| 0200 | Tower installation procedure completed. Start evacuating IVC overnight. |
| 0300 | Filled LN2 cold trap. |
| 1250 | Filled the liquid Nitrogen cold trap. |
| 1330 | Did the leak check. The background is 2E(-9) mbar/s. No increase in leak rate during spray test: no gross leak. |
| 1455 | Raise dewar. Pump and flush main bath. Background helium leak rate 2E-9 mbar l/s. Leak rate increases to 2.5E-9 mbar l/s: no gross leak. |
| 1535 | Filled IVC with 7.4 mbar of N2 gas. Begin LN2 transfer. |
| 1630 | Nitrogen dewar is empty. Nitrogen liquid level resistance 1.12 kΩ. Will switch to department's supply after cold hardware meeting. Nitrogen transfer stopped and pin-pong ball attached. |
| 1745 | Recommence nitrogen transfer with 25 l bomb dewar. Mixing chamber temperature 218 K. |
| 2030 | Nitrogen liquid level resistance 1.32 kΩ. Nitrogen transfer complete. |
| 2055 | Fill N2 cold trap full. |