UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20120503

2012/05/03

1010 Filled LN2 cold trap.
1117 Closed V6
1123 Closed Gate valve and condenser line speedivalve
1124 Closed all valves on IGH; G1: 1.5 mbar; G2: 608 mbar.
1135 Opened valves 11A, 11B, 7, 2A, 5A, then 1 and 2.
1143 Turn on He-4 pump.
1150 Pulled out cold traps.
2200 Finished cleaning cold traps. Begin circulating mixture (V6 @ 12.8%). Filled LN2 cold trap