| 1000 | Filled LN2 cold trap |
| 1220 | Mixing chamber temperature 5.6 K. IVC pressure 4.6E-7 mbar. Looks good. |
| | Close condenser speedivalve and gate valve. Start cryocleaning mixture through nitrogen cold trap 2. |
| 1345 | Interrupt cryocleaning. Pump mixture into dump in preparation for condensation. |
| 1445 | Switch to tower thermometer. Close all valves on IGN in preperation for condensation. Pressure in G2 612 mbar. |
| | Start 1 K pot: temperature 1.8-1.9 K. |
| | Open condenser speedivalve and gate valve. Start condensing mixture with automated procedure through nitrogen cold trap 1. |
| 1615 | Mixture mostly condensed, but automated procedure leaves some in dump. Open valve V9 periodically to extract it. Switch back to mixing chamber thermometer. |