2012/01/24
| 1950 | Start evacuating IVC. Seems to have held vacuum fairly well over last month: pressure in IVC was about 0.1 mbar. |
|---|---|
| 2015 | Fill N2 cold trap full. |
| 2055 | Conduct room temperature electrical check: everything looks fine. |
| Detector: | G102 DIB1 | BH: | Stripline | 19 | |
| SC: | ZB1-4-8 | 300 K | |||
|---|---|---|---|---|---|
| Face: | 2 | Date | 2012-01-24 | ||
| SQUET: | ZC23 | Who | HC | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| Phonon | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.4 | OK |
| SQUID bias B/Ret | 19 | 34 | 5 | OK | |
| SQUID bias C/Ret | 8 | 24 | 4.6 | OK | |
| SQUID bias D/Ret | 23 | 39 | 4.3 | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 18 | OK |
| Feedback B/Ret | 2 | 18 | 20 | OK | |
| Feedback C/Ret | 41 | 25 | 19 | OK | |
| Feedback D/Ret | 22 | 6 | 18 | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 107,93,87,90,88 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 87,87,91,87 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 84,85,74,84 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 87,84,84,84 | OK | |
| Charge | |||||
| FET heater +/- | 45 | 46 | 1.0 - 1.1 k | 1.068 | OK |
| Qi bias/QET Ret | 15 | 24 - 26 nS | open, 39 MOhm (B) | OK | |
| Qo bias/QET Ret | 11 | open, 39 MOhm (B) | OK | ||
| Qi feedback/Drain/Source | 50 | 16, 31 | 15 - 17 nS | 44 MOhm | OK |
| Qo feedback/Drain/Source | 30 | 12, 27 | 44 MOhm | OK | |
| Qi drain | 16 | chassis | < 0.1 nS | – | OK |
| Qo drain | 12 | chassis | – | OK | |
| Qi source | 31 | chassis | – | OK | |
| Qo source | 27 | chassis | – | OK | |
| FET Tsense +/FET heater- | 49 | 46 | 0.6 - 0.7 V | 0.726 | OK |
| LED 1 | 42 | chassis | 1.0 - 1.1 V | 1.139 | – |
| LED 2 | 26 | chassis | 1.128 | – | |
| Detector: | G102 DIB2 | BH: | Stripline | 20 | |
| SC: | ZB1-4-6 | 300 K | |||
|---|---|---|---|---|---|
| Face: | 5 | Date | 2012-01-24 | ||
| SQUET: | ZC70 | Who | HC | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.8 | OK |
| SQUID bias B/Ret | 19 | 34 | 4.4 | OK | |
| SQUID bias C/Ret | 8 | 24 | 4.6 | OK | |
| SQUID bias D/Ret | 23 | 39 | 5.2 | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 29 | OK |
| Feedback B/Ret | 2 | 18 | 25 | OK | |
| Feedback C/Ret | 41 | 25 | 28 | OK | |
| Feedback D/Ret | 22 | 6 | 35 | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 96,88,82,85,82 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 78,78,82,78 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 76,76,69,76 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 83,80,80,80 | OK | |
| FET heater +/- | 45 | 46 | 1.0 - 1.1 k | 1.061 | OK |
| Qi bias/QET Ret | 15 | 24 - 26 nS | open, 40 MOhm (C&D) | OK | |
| Qo bias/QET Ret | 11 | open, 39 MOhm (C&D) | OK | ||
| Qi feedback/Drain/Source | 50 | 16, 31 | 15 - 17 nS | 43 MOhm | OK |
| Qo feedback/Drain/Source | 30 | 12, 27 | 43 MOhm | OK | |
| Qi drain | 16 | chassis | < 0.1 nS | – | OK |
| Qo drain | 12 | chassis | – | OK | |
| Qi source | 31 | chassis | – | OK | |
| Qo source | 27 | chassis | – | OK | |
| FET Tsense +/FET heater- | 49 | 46 | 0.6 - 0.7 V | 0.71 | OK |
| LED 1 | 42 | chassis | 1.0 - 1.1 V | 1.137 | – |
| LED 2 | 26 | chassis | 1.127 | – | |
| 2115 | Start cryocleaning mixture through cold trap 2. Mixture is rather dirty (dump pressure is 765 mbar). Will need to clean nitrogen cold traps tomorrow. |
|---|