2011/12/08
-13V Am-241 Data - Long flashing (10 hrs)
| All figures below show order for individual charges: Top row- Q1, Q2; Bottom row- Q3, Q4 |
| Cut applied to the following analyses: Primary charge channel cut |
| No strict Chi2 cut was applied to spectra - only simple threshold cuts |
| For brevity on this page, I supplied links to charge, chi2, and charge baseline stdv. vs event time. |
| -13V Bias |
|---|
| Fig. 1 - Charge (1000 a.u.) vs. Event Time (sec) at -13V Bias |
| http://www.hep.umn.edu/cdms/cdms_restricted/K100/runs/run022/Voltage_Biases/n13V/20111208/v3_am/q_et.png |
| Fig. 2 - Charge Baseline Std vs. Event Time (sec) at -13V Bias |
|---|
| http://www.hep.umn.edu/cdms/cdms_restricted/K100/runs/run022/Voltage_Biases/n13V/20111208/v3_am/qstd_et.png |
| Fig. 3 - Chi2 vs. Event Time (sec) at -13V Bias |
|---|
| http://www.hep.umn.edu/cdms/cdms_restricted/K100/runs/run022/Voltage_Biases/n13V/20111208/v3_am/qchi_et.png |
| 1000 | Filled LN2 cold trap. |
|---|---|
| 1010 | DAQ error occurred last night during flashing. It seems the connection to DCRC30 was reset at 03:52. |
| 1017 | See pulses when triggering at 40ADC bin. Looks the crystal is recovered. |
|---|---|
| 1021 | 0V test run 07111208_1020 looks OK on screen. |
| 1023 | Start taking 07111208_1023_F0001. Am-241 data at -13V triggering at 40ADC bin. Data/flash/cooldown = 60/0.1/20 min. Tower temperature 61.4mK. |
| 1326 | DAQ error occurred at 12:56. Connection to DCRC30 was reset. |
| 1503 | Unplugged two boards to let them cool for a while. |
|---|---|
| 1617 | Power up both boards. |
| 1619 | 07111208_1619: flash detector for 6s and then cool down for 20min. Take Ba-133 data at -13V after flashing. |
| 1743 | Data not taken because of an error. Flash detector for 0.2min. |
| 1810 | Begin LHe transfer (~24%). |
| 1843 | End LHe transfer (~92%). |
| 2015 | Filled N2 cold trap. |
| 2111 | Temperature kept rising and fluctuating since 19:00. G1 and G2 kept rising too. There might be a blockage in the helium cold trap. |