| 1225 | @ 80.1K began pumping out N2 exchange gas. Never, ever make the mistake of forgetting to let exhange gas into the IVC when doing LN2 transfer. | ||
|---|---|---|---|
| 1255 | 79.7K ; turbo pump fully open to IVC. Current IVC pressure: 3E-5 mbar. Looking good. | ||
| 127 | IVC Pressure: 2.2E-6 mbar. Going home! | ||
| 849 | IVC pressure: 8.6E-7 mbar. | ||
| 1037 | Throughput test with leak checker connected to IVC yielded rate of 9.2E-9. No leak there. | ||
| Begin blowing out LN2. | |||
| 1111 | Electrical check okay. | ||
| Detector: | Stripline: | 19 | |
| SC: | 80K | ||
| Face: | Date | 2011-12-01 | |
| SQUET: | Who | RR | |
| Signal | Nominal | Actual | Chassis |
| (Gnd lead) | |||
| Nominal: | |||
| < 0.1 nS | |||
| SQUID bias A/Ret | 1 - 2 k | 1.6 | OK |
| SQUID bias B/Ret | 2 | OK | |
| SQUID bias C/Ret | 1.7 | OK | |
| SQUID bias D/Ret | 1.6 | OK | |
| Feedback A/Ret | 9 - 13 k | 7.3 | OK |
| Feedback B/Ret | 8.2 | OK | |
| Feedback C/Ret | 7.6 | OK | |
| Feedback D/Ret | 7.1 | OK | |
| QET A/Ret | 30 - 40 | 103, 54, 48, 51, 49 | OK |
| QET B/Ret | 47, 47, 51, 47 | OK | |
| QET C/Ret | 45, 45, 34, 44 | OK | |
| QET D/Ret | 48, 45 ,45 ,45 | OK | |
| FET heater +/- | 1.0 - 1.1 k | 1.044 | OK |
| Qi bias/QET Ret B | < 1 nS | ok | OK |
| Qo bias/QET Ret B | ok | OK | |
| Qi feedback/Drain/Source | 6 - 8 nS | 50MOhm | OK |
| Qo feedback/Drain/Source | 50MOhm | OK | |
| Qi drain | < 0.1 nS | – | OK |
| Qo drain | – | OK | |
| Qi source | – | OK | |
| Qo source | – | OK | |
| FET Tsense +/FET heater- | 0.9 - 1.0 V | 1.09 | OK |
| LED 1 | 1.2 - 1.5 V | 1.42 | – |
| LED 2 | 1.41 | – |
| Detector: | Stripline: | 20 | |||
| SC: | LN | ||||
|---|---|---|---|---|---|
| Face: | Date | 2011-12-01 | |||
| SQUET: | Who | RR | |||
| Signal | Nominal | Actual | Chassis | ||
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 1 - 2 k | 2 | OK | ||
| SQUID bias B/Ret | 1.7 | OK | |||
| SQUID bias C/Ret | 1.8 | OK | |||
| SQUID bias D/Ret | 2.1 | OK | |||
| Feedback A/Ret | 9 - 13 k | 15 | OK | ||
| Feedback B/Ret | 9.2 | OK | |||
| Feedback C/Ret | 14.2 | OK | |||
| Feedback D/Ret | 17.4 | OK | |||
| QET A/Ret | 30 - 40 | 87, 53, 46, 49, 46 | OK | ||
| QET B/Ret | 39, 39, 43, 39 | OK | |||
| QET C/Ret | 41, 41, 33, 41 | OK | |||
| QET D/Ret | 47, 44, 44, 44 | OK | |||
| FET heater +/- | 1.0 - 1.1 k | 1.04 | OK | ||
| Qi bias/QET Ret B | < 1 nS | OK | OK | ||
| Qo bias/QET Ret B | OK | OK | |||
| Qi feedback/Drain/Source | 6 - 8 nS | 50MOhm | OK | ||
| Qo feedback/Drain/Source | 49MOhm | OK | |||
| Qi drain | < 0.1 nS | – | OK | ||
| Qo drain | – | OK | |||
| Qi source | – | OK | |||
| Qo source | – | OK | |||
| FET Tsense +/FET heater- | 0.9 - 1.0 V | 1.1 | OK | ||
| LED 1 | 1.2 - 1.5 V | 1.416 | – | ||
| LED 2 | 1.408 | – | |||
| 1215 | Blowing out of LN2 done. |
|---|---|
| 1216 | Leak check done during blow out yielded: 2.1E-8 cc/s. No leak detected! |
| 1222 | Filled LN2 cold trap. |
| 1341 | Pumping on main bath. Note: it takes < 5 min for pressure on P2 to drop below 1000 mbar. |
| 1510 | Filled IVC with 0.12 mbar of He gas. |
| 1523 | Began LHe transfer (0%) - dewar pressurized at 1 psi. |
| 1659 | IVC pressure 1.6e-2 mbar. Pump out exchange gas at 15K |
| 1713 | MC X12004 10.5K. The lowest point was 9.7K. Temperature is still rising. The temperature should be at 4K by an extrapolation from the earlier cooling rate. Increase transfer pressure to 2psi. |
| 1721 | He level: -0.7%, start to collect liquid. |
| 1835 | End LHe transfer : 93.1% . IVC pressure: 7.4E-7 mbar |