2011/11/29
| 930 | IVC pressure: 2.5E-5 mbar l/s |
|---|---|
| 940 | Room background leak rate: 6.9E-9 mbar l/s; Hose background leak rate: 2.1E-8 mbar l/s ; IVC leak rate: 1.9E-8 mbar l/s. No leak found with spray test! |
| 1515 | Raised dewar. |
| 1547 | Electrical check at room temperature okay. |
| Cooldown checkout sheet (rev C SQUET) | |||||
|---|---|---|---|---|---|
| Detector: | G102 DIB1 | BH: | |||
| SC: | ZB1-4-8 | 300 K | |||
| Face: | 2 | Date | 2011-11-29 | ||
| SQUET: | ZC23 | Who | RR | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| Phonon | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.4 | OK |
| SQUID bias B/Ret | 19 | 34 | 5 | OK | |
| SQUID bias C/Ret | 8 | 24 | 4.6 | OK | |
| SQUID bias D/Ret | 23 | 39 | 4.3 | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 18 | OK |
| Feedback B/Ret | 2 | 18 | 20 | OK | |
| Feedback C/Ret | 41 | 25 | 19 | OK | |
| Feedback D/Ret | 22 | 6 | 18 | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 118 ,92, 87, 90, 88 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 87, 87, 91, 87 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 84,85,74,84 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 89,84,84,84 | OK | |
| Charge | |||||
| FET heater +/- | 45 | 46 | 1.0 - 1.1 k | 1.068 | OK |
| Qi bias/QET Ret B | 15 | 24 - 26 nS | 39 MOhm | OK | |
| Qo bias/QET Ret B | 11 | 39 MOhm | OK | ||
| Qi feedback/Drain/Source | 50 | 16, 31 | 15 - 17 nS | 44 MOhm | OK |
| Qo feedback/Drain/Source | 30 | 12, 27 | 44 MOhm | OK | |
| Qi drain | 16 | chassis | < 0.1 nS | – | OK |
| Qo drain | 12 | chassis | – | OK | |
| Qi source | 31 | chassis | – | OK | |
| Qo source | 27 | chassis | – | OK | |
| FET Tsense +/FET heater- | 49 | 46 | 0.6 - 0.7 V | 0.725 | OK |
| LED 1 | 42 | chassis | 1.0 - 1.1 V | 1.144 | – |
| LED 2 | 26 | chassis | 1.128 | – | |
| Detector: | G102 DIB2 | BH: | |||
| SC: | ZB1-4-6 | 300 K | |||
|---|---|---|---|---|---|
| Face: | 5 | Date | 2011-11-29 | ||
| SQUET: | ZC70 | Who | RR | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.8 | OK |
| SQUID bias B/Ret | 19 | 34 | 4.4 | OK | |
| SQUID bias C/Ret | 8 | 24 | 4.6 | OK | |
| SQUID bias D/Ret | 23 | 39 | 5.2 | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 29 | OK |
| Feedback B/Ret | 2 | 18 | 25 | OK | |
| Feedback C/Ret | 41 | 25 | 28 | OK | |
| Feedback D/Ret | 22 | 6 | 35 | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 115, 90, 82, 85, 82 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 78,78,82,78 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 76,76,69,76 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 83, 80, 80, 80 | OK | |
| FET heater +/- | 45 | 46 | 1.0 - 1.1 k | 1.06 | OK |
| Qi bias/QET Ret | 15 | 24 - 26 nS | 40 MOhm | OK | |
| Qo bias/QET Ret | 11 | 39 MOhm | OK | ||
| Qi feedback/Drain/Source | 50 | 16, 31 | 15 - 17 nS | 43 MOhm | OK |
| Qo feedback/Drain/Source | 30 | 12, 27 | 43 MOhm | OK | |
| Qi drain | 16 | chassis | < 0.1 nS | – | OK |
| Qo drain | 12 | chassis | – | OK | |
| Qi source | 31 | chassis | – | OK | |
| Qo source | 27 | chassis | – | OK | |
| FET Tsense +/FET heater- | 49 | 46 | 0.6 - 0.7 V | open | OK |
| LED 1 | 42 | chassis | 1.0 - 1.1 V | 1.137 | – |
| LED 2 | 26 | chassis | 1.127 | – | |
| 1612 | Pump main bath. |
|---|---|
| 1657 | Throughput tests: 1) 35 mbar/min 2) 44 mbar/min 3) 50 mbar/min |
| 1726 | Before filling dewar with He gas- room background leak rate: 1.6E-8 mbar l/s; Hose background leak rate: 2E-8 mbar l/s ; IVC leak rate: 6.5E-8 mbar l/s. Why is this so high? Background rate for room was higher. |
| 1727 | 4th throughput test done to see if circulating mixture had an effect on leak rate. No noticeable change. Test #4: 37 mbar/min. |
| 1730 | Closed off all valves to IVC to see if leak rate changes. Leak rate dropped to 2.8E-8 mbar l/s. |
| 1734 | Opened smaller in-line valve. LR (leak rate) increased to: 3.3E-8 cc/s |
| Opened little valve connected to smaller in-line valve. LR: 4.6E-8 cc/s | |
| Closed little valve. LR: 3.3E-8 cc/s | |
| Closed both in-line valves. LR: 2.7E-8 cc/s | |
| Opened larger in-line valve. LR increased dramatically to 1.1E-7 cc/s, and then decreased down to 5.6E-8 cc/s gradually. | |
| Spray test around flanges at top of the fridge did not produce a significant increase in LR. LR stayed consistent around 5E-8 cc/s. | |
| 1800 | Filled main bath with He gas. Leak check- LR: 5.2E-8 cc/s |
| Before disconnecting leak checker, hose LR: 9E-9 cc/s | |
| 1830 | Pumping out N2 gas line for LN2 transfer. |
| 2105 | Filled IVC with 3.4 mbar of N2 gas. correction ⇒ Only line to IVC was filled with 3.4 mbar of N2 gas. IVC was closed off. |
| 2120 | Pump 1K pot. Pump mixture from fridge. Begin LN2 transfer. |
| 2348 | End LN2 transfer. Put on ping pong ball. |