2011/11/23
| 1145 | Vented IVC with N2 gas. |
|---|---|
| 1204 | Tower thermometer connection looked OK at room temperature. No shorts to ground. |
| 1715 | Start tower assembly procedure. |
| 1830 | One severed wire bond found on Qi DIB1 and respective pad on crystal. Plucked wire bond to prevent possible short to chassis. Qi on DIB1 passed detector level continuity check, so one wire bond is still present. |
| 1915 | Conduct tower level continuity check. No shorts to chassis found. |
| Detector | G102 | DIB | 1 | |
|---|---|---|---|---|
| side coax | ZB1-4-8 | date/who: | 2011-11-22 | HC & AC |
| face | 2 | |||
| +ve lead | -ve lead | signal | measured | |
| 3 | 4 | QET B | 127 Ω | |
| 9 | chassis | LED1 Rforward | 778 kΩ | |
| 10 | chassis | LED2 Rforward | 754 kΩ | |
| 9 | chassis | LED1 Vforward | 1.103 V | |
| 10 | chassis | LED2 Vforward | 1.102 V | |
| chassis | 9 | LED1 Rreverse | <0.3 nS | |
| chassis | 10 | LED2 Rreverse | <0.6 nS | |
| 3 | 11 | Qo Rbias | 25.0 nS | |
| 12 | 11 | Qo C coupling | <0.1 nS | |
| 12 | 13 | Qo Rfeedback | 25.5 nS | |
| 3 | 14 | Qi Rbias | 26.0 nS | |
| 15 | 14 | Qi C coupling | <0.1 nS | |
| 15 | 16 | Qi Rfeedback | 25.0 nS | |
| Detector | G102 | DIB | 2 | |
|---|---|---|---|---|
| side coax | ZB1-4-6 | date/who: | 2011-11-22 | HC & AC |
| face | 5 | |||
| +ve lead | -ve lead | signal | measured | |
| 5 | 6 | QET C | 352 Ω | |
| 6 | 8 | QET C-D | 362 Ω | |
| 7 | 8 | QET D | 1.25 kΩ | |
| 9 | chassis | LED1 Rforward | 771 kΩ | |
| 10 | chassis | LED2 Rforward | 752 kΩ | |
| 9 | chassis | LED1 Vforward | 1.106 V | |
| 10 | chassis | LED2 Vforward | 1.105 V | |
| chassis | 9 | LED1 Rreverse | <0.3 nS | |
| chassis | 10 | LED2 Rreverse | <1.1 nS | |
| 5 | 11 | Qo Rbias | 25.5 nS | |
| 12 | 11 | Qo C coupling | <0.1 nS | |
| 12 | 13 | Qo Rfeedback | 26.0 nS | |
| 5 | 14 | Qi Rbias | 25.0 nS | |
| 15 | 14 | Qi C coupling | <0.1 nS | |
| 15 | 16 | Qi Rfeedback | 26.0 nS | |