| 1930 | Fill N2 cold trap full. |
| | IVC pressure 1.4E-5 mbar: looks like pumping overnight didn't do anything to help. Switch off mixing chamber heater in preparation for condensening mixture. |
| 1935 | Mixing chamber temperature dipped below 4.2 K. IVC pressure decreased to 7.4E-6 mbar, but has increased in the last five minutes to 1.2E-5 mbar. I don't think condensing the mixture is going to work. |
| 1945 | Start 1 K pot: temperature 1.7 K. |
| | Interrupt cyrocleaning. Pump mixture into dump. |
| 2025 | Open condenser line speedivalve and gate valve. Commence condensing mixture through nitrogen cold trap 1. Temperature of 1 K pot 1.86 K. |