UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20111107

2011/11/07

1955 Detector canister taken to clean room. Pressure in canister 8 psi.
Begin unpacking crystal.
2015 Conduct detector level continuity checks:
Table 1: Detector level continuity checks
DIB 1 DIB 2
Signal Measured Measured
QET D 241 Ω 257 Ω
LED1 R forward 765 kΩ 790 kΩ
LED1 V forward 1.061 V 1.062 V
LED1 G backward <1.4 nS <0.1 nS
LED2 R forward - 768 kΩ
LED2 V forward - 1.062 V
LED2 G backward - <3.0 nS
Qo(+ve)-Qi(-ve) 456 Ω 460 Ω
Qi(+ve)-Qo(-ve) 255 Ω 291 Ω

DIB1 LED2 open according to detector history elog entry 1389

2030 Detector placed in purge cabinet, second shelf.