| 1500 | IVC pressure 3E-5 mbar. Warm up leak checker. |
| 1600 | Filament on leak checker faulty: won't turn on. It might have burned out. Will talk to Jon on Monday. Continue without leak check and hope for the best. |
| | Raise dewar. |
| 1750 | Pump and flush dewar with He-4 gas. |
| | Evacuate 1 K pot. |
| | Fill IVC with 4.6 mbar N2 exchange gas. |
| | Start liquid nitrogen transfer. |
| 1838 | Filled N2 cold trap. Started cryocleaning mixture. V6=14.1% |
| 2025 | Nitrogen liquid level meter resistance 1.32 kΩ. Nitrogen transfer complete. Attach ping-pong ball. |