| 0955 | IVC pressure 4.6e-5 mbar. Tightened IVC bottom In seal again. |
| 1457 | IVC pressure 3.0e-5 mbar. |
| 1525 | Calibrated the leak checker with a 1.4e-7cc/s standard leak. Could not reach the rated reading. Positioned the leak value at 0.7e-7cc/s for convenience. The real leak value will be twice of the reading. |
| 1535 | Room He background 7e-9cc/s. |
| 1555 | Room He BG 6.4e-9cc/s. The signal is very noisy. A lot of spikes showing up on the baseline. |
| 1557 | After tightening all the clamps, the spikes became less frequent. |
| 1603 | Room He BG ~6e-9cc/s. |
| 1608 | Isolate pumping station. IVC He BG 2.2e-8cc/s. |
| 1616 | No gross leak found at BG 2.1e-8cc/s/ |
| 1845 | Raise dewar. Pump and flush main bath. No leak found above background level of 1E-8 mbar l/s. |
| | Fill IVC with 4.6 mbar N2 exchange gas. Commence nitrogen transfer. |
| 2015 | Main bath full. Cease nitrogen transfer. |
| 2125 | Fill N2 cold trap full. |
| | Start cryocleaning mixture overnight. Valve 6 on IGH open 13.9%. |