2011/10/04

1935 Background helium leak level 5E-9 mbar l/s.
Nitrogen blown out of main bath: some minor fluctuations, but leak rate returns to 5E-9 mbar l/s indicating that there is no leak from main bath to IVC at 77 K.
Mixture cryocleaned and throughput test conducted. Throughput test yields 45 mbar/min. Leak rate remains at 5E-9 mbar l/s. No leak from mixing chamber lines to IVC at 77 K.
Fill N2 cold trap full. Cryoclean mixture overnight.