UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20111001

2011/10/01

1357 IVC P = 1.6e-5 mbar.
1402 Start leak checker in case a leak check is needed.
1748 Filling main bath with He gas, no gross leak found at BG = 1.6 cc/s.
1751 Evacuate 1K pot.
1802 5.4mbar N2 exchange gas in IVC. Start transferring liquid N2.