UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20110921

2011/09/21

1211 MX X12004=77.55K, IVC P=3mbar. Start pumping out exchange gas.
1350 Fill N2 cold trap full.
1405 Start blowing out liquid nitrogen.
1453 Pump mixture into dump.
1519 Throughput test ~40mbar/min. Pump mixture into dump.
1536 LN2 is out. Stop pressurizing the bath.
1615 Pump out main bath.
1927 Start collecting liquid Helium.
1932 Increased He gas pressure from 1psi to 2psi.
2025 Finished He transfer at 92.6%