0950 Start assembling G51
1002 Checked all channel to ground, no shorts found on the detector
1019 Put G51 and tower back to N2 purge. It's best to take a picture of G51 before assembling.
1102 Got an camera, resume assembling tower. Need WIP-0609 cleanroom wipes. Need to turn down N2 pressure.
1127 DIB1→Face2(ZB-5)→ZIB1-1-6, DIB2→Face5(ZB-8)→ZIB1-1-9
1135 Need a new screw for thermometer.
1318 Tower assembled and double bagged and sitting in the clean room.
Detector G51 DIB 1
side coax ZB1-1-6 date/who: 2011-09-19 JZ
face 2
+lead - lead signal typical measured
1 2 QET A 100 to 200 Ω 136.6 Ω
2 4 QETA-B 100 to 200 Ω 250.3 Ω
3 4 QET B 100 to 200 Ω 243.9 Ω
4 6 QETB-C 100 to 200 Ω 263.1 Ω
5 6 QET C 100 to 200 Ω 210.2 Ω
6 8 QETC-D 100 to 200 Ω 268.1 Ω
7 8 QET D 100 to 200 Ω open
2 8 QETA-D 100 to 200 Ω 236.3 Ω
chassis 9 LED1 Rforward 8 to 9 MΩ 785 kΩ
chassis 10 LED2 Rforward 8 to 9 MΩ 746 kΩ
chassis 9 LED1 Vforward 1.0 to 1.1 V 1.106 V
chassis 10 LED2 Vforward 1.0 to 1.1 V 1.105 V
9 chassis LED1 Rreverse <1 nS <0.2 nS
10 chassis LED2 Rreverse <1 nS <2.8 nS
1 11 Qo Rbias 24 to 26 nS 26 nS
12 11 Qo C coupling <1 nS <0.1 nS
12 13 Qo Rfeedback 24 to 26 nS 26 nS
1 14 Qi Rbias 24 to 26 nS 26 nS
15 14 Qi C coupling <1 nS <0.1 nS
15 16 Qi Rfeedback 24 to 26 nS 26 nS
Detector G53 DIB 2
side coax ZB1-1-9 date/who: 2011-09-08 HC
face 5
+lead - lead signal typical measured
1 2 QET A 100 to 200 Ω open
2 4 QETA-B 100 to 200 Ω 248.5 Ω
3 4 QET B 100 to 200 Ω 249.2 Ω
4 6 QETB-C 100 to 200 Ω 270.6 Ω
5 6 QET C 100 to 200 Ω 204.3 Ω
6 8 QETC-D 100 to 200 Ω 265.0 Ω
7 8 QET D 100 to 200 Ω 202.7 Ω
2 8 QETA-D 100 to 200 Ω 230.5 Ω
chassis 9 LED1 Rforward 8 to 9 MΩ 793 kΩ
chassis 10 LED2 Rforward 8 to 9 MΩ 788 kΩ
chassis 9 LED1 Vforward 1.0 to 1.1 V 1.104 V
chassis 10 LED2 Vforward 1.0 to 1.1 V 1.103 V
9 chassis LED1 Rreverse <1 nS <0.1 nS
10 chassis LED2 Rreverse <1 nS <0.1 nS
2 11 Qo Rbias 24 to 26 nS 26 nS
12 11 Qo C coupling <1 nS <0.1 nS
12 13 Qo Rfeedback 24 to 26 nS 26 nS
2 14 Qi Rbias 24 to 26 nS 26 nS
15 14 Qi C coupling <1 nS <0.1 nS
15 16 Qi Rfeedback 24 to 26 nS 26 nS
1830 Start installing tower
1015 IVC sealed up. Start pumping.

Visiual inspection of G51

p9190009.jpg
p9190010.jpg
p9190011.jpg
p9190012.jpg
p9190013.jpg
p9190014.jpg
p9190015.jpg
p9190016.jpg