UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20110918

2011/09/18

1430 Filled N2 cold trap with the rest of the liquid N2.

G53 charge breakdown measurement

The psds and matlab figures can be found at here. The matlab script is at here.

G53 charge breakdown measurement

G53 tower removal and disassembly

1600 Begin tower removal procedure. IVC overpressurised at 1/3 psi N2 gas. G53 in mini-clean room.
1730 Tower removal complete. G53 taken to clean room.
1800 Tower disassembly procedure started. G53 on clean bench.
1900 Tower disassembly procedure complete. Conduct detector level continuity checks.
DIB 1 DIB 2
Signal Measured Measured
QET A 45.0 Ω 46.5 Ω
QET B 175 Ω 178 Ω
QET C 132 Ω 132 Ω
QET D 127 Ω 127 kΩ
LED1 R forward 755 kΩ 772 kΩ
LED1 V forward 1.064 V 1.064 V
LED1 R backward <0.4 nS <0.1 nS
LED2 R forward 720 kΩ 771 kΩ
LED2 V forward 1.066 V 1.064 V
LED2 R backward <0.5 nS <0.1 nS
Qo(+ve)-Qi(-ve) 113 Ω 123 Ω
Qi(+ve)-Qo(-ve) 81.5 Ω 84.6 Ω
1910 Start shipping container assembly procedure. G53 in clean room.