2011/08/26
| 0045 | Conduct electrical check - no problems. |
|---|
| Detector: | G102 DIB1 | BH: | |||
| SC: | ZB1-4-6 | 300 K | |||
|---|---|---|---|---|---|
| Face: | 2 | Date | 2011-08-26 | ||
| SQUET: | ZC23 | Who | HC&JZ | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.4 | OK |
| SQUID bias B/Ret | 19 | 34 | 5 | OK | |
| SQUID bias C/Ret | 8 | 24 | 4.6 | OK | |
| SQUID bias D/Ret | 23 | 39 | 4.3 | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 18 | OK |
| Feedback B/Ret | 2 | 18 | 20 | OK | |
| Feedback C/Ret | 41 | 25 | 19 | OK | |
| Feedback D/Ret | 22 | 6 | 18 | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 85,106,85,86,86 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 86,85,87,86 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 88,85,74,84 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 84,84,84,84 | OK | |
| FET heater +/- | 45 | 46 | 1.0 - 1.1 k | 1.068 | OK |
| Qi bias/QET Ret | 15 | 24 - 26 nS | 38 MOhm | OK | |
| Qo bias/QET Ret | 11 | 38 MOhm | OK | ||
| Qi feedback/Drain/Source | 50 | 16, 31 | 15 - 17 nS | OL | OK |
| Qo feedback/Drain/Source | 30 | 12, 27 | OL | OK | |
| Qi drain | 16 | chassis | < 0.1 nS | – | OK |
| Qo drain | 12 | chassis | – | OK | |
| Qi source | 31 | chassis | – | OK | |
| Qo source | 27 | chassis | – | OK | |
| FET Tsense +/FET heater- | 49 | 46 | 0.6 - 0.7 V | 0.87 | OK |
| LED 1 | 42 | chassis | 1.0 - 1.1 V | 1.259 | – |
| LED 2 | 26 | chassis | 1.239 | – | |
| Detector: | G102 DIB2 | BH: | |||
| SC: | ZB1-4-8 | 300 K | |||
|---|---|---|---|---|---|
| Face: | 5 | Date | 2011-08-26 | ||
| SQUET: | ZC70 | Who | HC&JZ | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.8 | OK |
| SQUID bias B/Ret | 19 | 34 | 4.4 | OK | |
| SQUID bias C/Ret | 8 | 24 | 4.6 | OK | |
| SQUID bias D/Ret | 23 | 39 | 5.2 | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 29 | OK |
| Feedback B/Ret | 2 | 18 | 26 | OK | |
| Feedback C/Ret | 41 | 25 | 28 | OK | |
| Feedback D/Ret | 22 | 6 | 35 | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 80,100,79,80,79 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 76,76,77,76 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 80,77,69,76 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 80,80,80,80 | OK | |
| FET heater +/- | 45 | 46 | 1.0 - 1.1 k | 1.06 | OK |
| Qi bias/QET Ret | 15 | 24 - 26 nS | 38 MOhm | OK | |
| Qo bias/QET Ret | 11 | 39 MOhm | OK | ||
| Qi feedback/Drain/Source | 50 | 16, 31 | 15 - 17 nS | OL | OK |
| Qo feedback/Drain/Source | 30 | 12, 27 | OL | OK | |
| Qi drain | 16 | chassis | < 0.1 nS | – | OK |
| Qo drain | 12 | chassis | – | OK | |
| Qi source | 31 | chassis | – | OK | |
| Qo source | 27 | chassis | – | OK | |
| FET Tsense +/FET heater- | 49 | 46 | 0.6 - 0.7 V | open | OK |
| LED 1 | 42 | chassis | 1.0 - 1.1 V | 1.235 | – |
| LED 2 | 26 | chassis | 1.218 | – | |
| 0200 | Finish tower installation. Evacuate IVC overnight. |
|---|---|
| 1400 | IVC pressure a little high at 1E-4 mbar. Could this be a leak? Connect leak checker. |
| 1715 | Conduct leak check. Background helium leak level a little high at 1.9E-8 mbar l/s. Varies between 1.8E-8 and 2E-8 mbar l/s during spray test. Did jump to 2.6E-8 mbar l/s at one point, but it was not possible to recreate this, so it can only be assumed that this is due to a virtual leak. |
| No gross leak. | |
| 1800 | Dewar pressure 1.9E-2 mbar. Commence evacuation. |
| 1920 | Stop evacuating dewar at pressure 2.5E-3 mbar. Recommence evacuating IVC. |
| Raise dewar. | |
| 2015 | Pump and flush dewar with He-4 gas. |
| Conduct leak check. Background helium leak level 1.2E-8 mbar l/s. Leak rate did not rise above background: no leak. | |
| 2025 | Evacuate 1 K pot. |
| 2104 | Start transfer liquid N2. N2 exchange gas 2.2mbar at RT. |
| 2312 | Stop transfer liquid N2. |
| 2340 | Fill N2 cold trap full. |
| Start cryocleaning mixture overnight. Valve 6 open 13.9%. |