2011/07/19
| 0902 | A DAQ error occurred at 06:02. |
|---|
Data collected in the last run
4.4G ./07110718_2110 4.5G ./07110718_2330 4.5G ./07110719_0150 4.5G ./07110719_0410
| 1825 | Begin LHe Transfer. Helium level at 0.7% |
|---|---|
| 1910 | End LHe Transfer. Helium level at 78.7% |
| 1930 | Filled N2 cold trap. |
| 2034 | Start taking data 07110719_2024_F0001. -2.5V on DIB1, 2.5V on DIB2. Trigger on 8 phonon channels at (12, 15, 27, 20, 14, 8, 15, 17) ADC bin for A1-D2. Trace length 3.2768ms, lookback time 400us. Data/flash/cooldown = 120min/0.6s/20min. |
