UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20110719

2011/07/19

0902 A DAQ error occurred at 06:02.

Data collected in the last run

4.4G    ./07110718_2110
4.5G    ./07110718_2330
4.5G    ./07110719_0150
4.5G    ./07110719_0410
1825 Begin LHe Transfer. Helium level at 0.7%
1910 End LHe Transfer. Helium level at 78.7%
1930 Filled N2 cold trap.
2034 Start taking data 07110719_2024_F0001. -2.5V on DIB1, 2.5V on DIB2. Trigger on 8 phonon channels at (12, 15, 27, 20, 14, 8, 15, 17) ADC bin for A1-D2. Trace length 3.2768ms, lookback time 400us. Data/flash/cooldown = 120min/0.6s/20min.