| 0005 | Nitrogen level meter resistance 1.35 kΩ. Stop LN2 transfer. Mixing chamber temperature 211 K, and falling. |
| 0020 | Fill N2 cold trap full. |
| 1000 | Pump out N2 exchange gas. |
| 1219 | Electrical checks are OK at 82K. Throughput test: 43mbar/min. No leak from circulation line. |
| 1330 | Start blowing out nitrogen. |
| 1345 | Rubber hose split, resulting in liquid nitrogen being sprayed everywhere. Interrupt blowing out to cut tube. |
| 1355 | Recommence blowing out. |
| 1500 | Finished blowing out LN2. Filled LN2 cold trap. Pumped transfer stick. |
| | Helium leak level 2E-7 mbar l/s: no change from background, so looks like there is no significant cryoleak. |
| 1630 | Slight setback by pulling out LN2 transfer stick without over-pressurizing line with helium. Corrected that. |
| 1718 | Begun LHe transfer. |
| 1821 | Start pumping He-4 exchange gas |
| 1841 | Ended LHe transfer (87.2%). |
| 1919 | Keep pumping IVC. Start 1K pot, start condensing mixture. Mixing chamber temperature: 4.25K. IVC pressure: 2.2e-6mbar. |
| 2111 | Close IVC. Start circulation. Tower temperature:2.1K. |
| 2211 | Bake detector overnight. Tower temperature: 545mK. |