UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20110505run11

2011/05/05

Shipping Container Assembly Procedure

Figure 1: Install lid on bottom of detector housing.
installlid.jpg
Care must be taken as it is all too easy to strip the heads of M2 brass screws.
Figure 2: Fasten structure together with 6 M2 brass rods.
fastenrods.jpg
Figure 3: Mount aluminium adapter plate with 6 M3 brass screws.
mountaladapterplate.jpg
Figure 4: Mount turntable to Al adapter plate with 4-40 slot head screws.
mountturntable.jpg
Figure 5: Place structure in puck and fasten turntable to floor with 4-40 slot head screws. This takes a lot of patience and good hand-eye coordination.
fastenturntabletopuck1.jpg fastenturntabletopuck2.jpg
Figure 6: Fasten puck's lid with six 8-32 bolts in a star-pattern to apply uniform pressure on o-ring.
fastenpucklid.jpg
Figure 7: Flush puck with LN2 boil off. Finger over adapter fitting until pressure reaches 15 psig, then release and repeat 7 times. Overpressurise to 7.5 psig upon final iteration. Image on right is fitting we made to mate the puck with our LN2 boil off.
flushpuck.jpg adapterfittingtoswagelok.jpg
Figure 8: Stretch rubber bands from box corners to mount puck in box. Pressure gauge displays just over 8 psig.
puckinbox.jpg pressuregauge.jpg
Figure 9: Mount shock sensor.
mountshocksensor.jpg