0948 Filled N2 cold trap. MC X12004 88.5K. Temperature dropped 20K in the past 4 hours. IVC pressure 0.54mBar. The temperature dropping rate seems a bit slow. But the exchange gas pressure should be good enough, same as in the last run(?).
1215 Switch from cold trap 2 to cold trap 1 to facilitate cleaning of cold trap 2.
Mixing chamber temperature 83.0 K.
1525 Pump out N2 exchange gas.
Mixing chamber temperature 79.6 K.
1625 Stop evacuating IVC at pressure 4E-6 mbar. Background He leak rate 3.6E-9 mbar l/s, rising very slowly.
Start blowing out LN2.
1700 Fill N2 cold trap full.
1740 LN2 out of main dewar. He leak rate rose steadily to 1.2E-8 mbar l/s: a bit high, but no spike so no significant leak.

Electrical Check at 77 K

1755 Perform electrical check. Mixing chamber temperature 78.9 K.
Detector: G42 DIB1 BH: Stripline: 20
SC: ZB1-1-9 300 K LN
Face: 5 Date 2011-04-23 Date 2011-04-25
SQUET: ZC70 Who HC & JZ Who HC & JZ
Signal Pos. lead Gnd lead Nominal Actual Chassis Nominal Actual Chassis
(Gnd lead) (Gnd lead)
Nominal: Nominal:
< 0.1 nS < 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k 4.9 OK 1 - 2 k 1.96 OK
SQUID bias B/Ret 19 34 4.4 OK 1.7 OK
SQUID bias C/Ret 8 24 4.7 OK 1.82 OK
SQUID bias D/Ret 23 39 5.3 OK 2.09 OK
Feedback A/Ret 37 21 15 - 25 k 29.4 OK 9 - 13 k 15 OK
Feedback B/Ret 2 18 25.6 OK 9.2 OK
Feedback C/Ret 41 25 28.6 OK 4.2 OK
Feedback D/Ret 22 6 34.8 OK 17.4 OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 79.5,81.2,79.2,80.1,80.1 OK 30 - 40 43,44,42,43,43 OK
QET B/Ret 35 29, 33, 47, 48 76,76,79,76 OK 37,37,40,37 OK
QET C/Ret 7 5, 9, 10, 28 78, 77, 69, 77 OK 41,41,33,40 OK
QET D/Ret 38 36, 40, 43, 44 81, 80, 80, 80 OK 44,43,43,43 OK
FET heater +/- 45 46 1.0 - 1.1 k 1.06 OK 1.0 - 1.1 k 1.04 OK
Qi bias/QET Ret 15 24 - 26 nS 39MΩ OK < 1 nS OK OK
Qo bias/QET Ret 11 39MΩ OK OK OK
Qi feedback/Drain/Source 50 16, 31 15 - 17 nS 43.5MΩ, 43.5Ohm OK 6 - 8 nS 50MΩ, 50MΩ OK
Qo feedback/Drain/Source 30 12, 27 43.6MΩ, 43.6MΩ OK 50MΩ, 50MΩ OK
Qi drain 16 chassis < 0.1 nS – OK < 0.1 nS – OK
Qo drain 12 chassis – OK – OK
Qi source 31 chassis – OK – OK
Qo source 27 chassis – OK – OK
FET Tsense +/FET heater- 49 46 0.6 - 0.7 V 0.7 OK 0.9 - 1.0 V 1.084 OK
LED 1 42 chassis 1.0 - 1.1 V 1.13 – 1.2 - 1.5 V 1.411 –
LED 2 26 chassis 1.12 – 1.403 –
Detector: G42 DIB2 BH: Stripline: 19
SC: ZB1-1-6 300 K LN
Face: 2 Date 2011-04-23 Date 2011-04-25
SQUET: ZC23 Who HC & JZ Who HC & JZ
Signal Pos. lead Gnd lead Nominal Actual Chassis Nominal Actual Chassis
(Gnd lead) (Gnd lead)
Nominal: Nominal:
< 0.1 nS < 0.1 nS
SQUID bias A/Ret 4 20 3 - 5 k 4.4 OK 1 - 2 k 1.63 OK
SQUID bias B/Ret 19 34 5 OK 1.99 OK
SQUID bias C/Ret 8 24 4.6 OK 1.73 OK
SQUID bias D/Ret 23 39 4.3 OK 1.58 OK
Feedback A/Ret 37 21 15 - 25 k 19 OK 9 - 13 k 7.3 OK
Feedback B/Ret 2 18 21 OK 8.2 OK
Feedback C/Ret 41 25 19 OK 7.6 OK
Feedback D/Ret 22 6 18 OK 8.1 OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 85, 87, 85, 86, 86 OK 30 - 40 44,46,44,45,46 OK
QET B/Ret 35 29, 33, 47, 48 86, 86, 89, 86 OK 45,44,47,44 OK
QET C/Ret 7 5, 9, 10, 28 86, 85, 75, 85 OK 45,45,34,44 OK
QET D/Ret 38 36, 40, 43, 44 85, 84, 84, 84 OK 45,44,44,44 OK
FET heater +/- 45 46 1.0 - 1.1 k 1.069 OK 1.0 - 1.1 k 1.044 OK
Qi bias/QET Ret 15 24 - 26 nS 38MΩ OK < 1 nS OK OK
Qo bias/QET Ret 11 38MΩ OK OK OK
Qi feedback/Drain/Source 50 16, 31 15 - 17 nS 43MΩ, 43MΩ OK 6 - 8 nS 49MΩ, 49MΩ OK
Qo feedback/Drain/Source 30 12, 27 43MΩ, 43MΩ OK 49MΩ, 49MΩ OK
Qi drain 16 chassis < 0.1 nS – OK < 0.1 nS – OK
Qo drain 12 chassis – OK – OK
Qi source 31 chassis – OK – OK
Qo source 27 chassis – OK – OK
FET Tsense +/FET heater- 49 46 0.6 - 0.7 V 0.721 OK 0.9 - 1.0 V 1.091 OK
LED 1 42 chassis 1.0 - 1.1 V 1.138 – 1.2 - 1.5 V 1.417 –
LED 2 26 chassis 1.128 – 1.407 –
1800 Pump mixture into dump in preparation for throughput test.
Pump out main bath.
1815 Background He leak rate 1.3E-8 mbar l/s. Start throughput test.
Throughput test yields rate of 43 mbar/min. Pump mixture into dump.
No significant change in He leak rate: no leak from mixing chamber pipes to IVC.
1830 Pump out helium transfer stick.
1850 Stop pumping helium transfer stick.
1910 Evacuate 1 K pot.
1930 Overpressurise main bath with He gas. Background leak rate 9.1E-9 mbar l/s. He leak rate drops a little to 8.9E-9 mbar l/s: no leak.
1940 Fill IVC with 0.12 mbar He-4 exchange gas.
2000 Start first LHe transfer.
2053 MX X12004 was 43K while He level > 22%. Hassan said he put in 0.12mbar exchange gas before transfer. This should be good. Maybe the transfer was too fast. IVC pressure 2.2e-2 mbar. Temperature still drops kind of linearly.
2140 Stop LHe transfer. Main bath 97.6% full. Mixing chamber temperature 10.7 K and falling fast. Slope is still fairly linear.
2150 Pump out He-4 exchange gas. Mixing chamber temperature 8.0 K.
2220 Fill N2 cold trap full.
Start cryocleaning mixture through cold trap 1. Valve 6 open 13.8%. Leave running overnight.
Open valves 8 and 11b to pump out any remaining mixture in cold trap 2. Leave open overnight.