| 1440 | Stop evacuating IVC at pressure 3E-5 mbar in preparation for leak check. |
| 1500 | Bakcground He leak rate 7.7E-9 mbar l/s. |
| | Leak rate varies between 7.1E-9 mbar l/s and 8.7E-9 mbar l/s: no leak. |
| | Evacuate dewar. |
| 1930 | Dewar raised. |
| 1950 | Flush main bath with He gas. Background He leak rate of 6E-9 mbar l/s; rises to 6.8E-9 mbar l/s: no leak. |
| 2045 | Fill IVC with 1.2 mbar of N2 gas. |
| | Start LN2 transfer. |
| 2345 | Resistor resistance 1.32 kΩ. Stop LN2 transfer. Mixing chamber temperature 200 K. |
| 2355 | Fill N2 cold trap full. |