2011/03/12
| 0330 | Conduct electrical check at 300 K. |
|---|---|
| Qo feedback shorted to ground on DIB1, SQUET card ZC-23, stripline 19. Unplugged and replugged stripline. That did the trick: maybe pin 23 missed its socket. |
| Detector: | G101 DIB1 | Stripline: | 19 | ||
| SC: | ZB1-1-9 | 300 K | |||
|---|---|---|---|---|---|
| Face: | 5 | Date | 2011-03-12 | ||
| SQUET: | ZC23 | Who | HC & JZ | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.4 | OK |
| SQUID bias B/Ret | 19 | 34 | 5 | OK | |
| SQUID bias C/Ret | 8 | 24 | 4.6 | OK | |
| SQUID bias D/Ret | 23 | 39 | 4.3 | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 19 | OK |
| Feedback B/Ret | 2 | 18 | 21 | OK | |
| Feedback C/Ret | 41 | 25 | 19 | OK | |
| Feedback D/Ret | 22 | 6 | 18 | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 94,87,85,86,86 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 92,92,100,92 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 87,85,74,84 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 85,84,84,84 | OK | |
| FET heater +/- | 45 | 46 | 1.0 - 1.1 k | 1.068 | OK |
| Qi bias/QET Ret | 15 | 24 - 26 nS | 26 (PA), open (PB, PC, PD) | OK | |
| Qo bias/QET Ret | 11 | 26 (PA), open (PB, PC, PD) | OK | ||
| Qi feedback/Drain/Source | 50 | 16, 31 | 15 - 17 nS | 23 | OK |
| Qo feedback/Drain/Source | 30 | 12, 27 | 23 | OK | |
| Qi drain | 16 | chassis | < 0.1 nS | – | OK |
| Qo drain | 12 | chassis | – | OK | |
| Qi source | 31 | chassis | – | OK | |
| Qo source | 27 | chassis | – | OK | |
| FET Tsense +/FET heater- | 49 | 46 | 0.6 - 0.7 V | 0.721 | OK |
| LED 1 | 42 | chassis | 1.0 - 1.1 V | 1.137 | – |
| LED 2 | 26 | chassis | open | – | |
| Detector: | G101 DIB2 | Stripline: | 20 | ||
| SC: | ZB1-1-6 | 300 K | |||
|---|---|---|---|---|---|
| Face: | 2 | Date | 2011-03-12 | ||
| SQUET: | ZC70 | Who | HC & JZ | ||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis |
| (Gnd lead) | |||||
| Nominal: | |||||
| < 0.1 nS | |||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.9 | OK |
| SQUID bias B/Ret | 19 | 34 | 4.4 | OK | |
| SQUID bias C/Ret | 8 | 24 | 4.7 | OK | |
| SQUID bias D/Ret | 23 | 39 | 5.3 | OK | |
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 29 | OK |
| Feedback B/Ret | 2 | 18 | 26 | OK | |
| Feedback C/Ret | 41 | 25 | 29 | OK | |
| Feedback D/Ret | 22 | 6 | 35 | OK | |
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 89,82,80,80,80 | OK |
| QET B/Ret | 35 | 29, 33, 47, 48 | 83,82,90,83 | OK | |
| QET C/Ret | 7 | 5, 9, 10, 28 | 79,77,69,76 | OK | |
| QET D/Ret | 38 | 36, 40, 43, 44 | 81,80,80,80 | OK | |
| FET heater +/- | 45 | 46 | 1.0 - 1.1 k | 1.061 | OK |
| Qi bias/QET Ret | 15 | 24 - 26 nS | open | OK | |
| Qo bias/QET Ret | 11 | open | OK | ||
| Qi feedback/Drain/Source | 50 | 16, 31 | 15 - 17 nS | 23,23 | OK |
| Qo feedback/Drain/Source | 30 | 12, 27 | 23,23 | OK | |
| Qi drain | 16 | chassis | < 0.1 nS | – | OK |
| Qo drain | 12 | chassis | – | OK | |
| Qi source | 31 | chassis | – | OK | |
| Qo source | 27 | chassis | – | OK | |
| FET Tsense +/FET heater- | 49 | 46 | 0.6 - 0.7 V | 0.706 | OK |
| LED 1 | 42 | chassis | 1.0 - 1.1 V | 1.129 | – |
| LED 2 | 26 | chassis | 1.121 | – | |
| 0500 | Seal up IVC and evacuate. |
|---|---|
| 1506 | Isolate pumping station. IVC He background 3.5E-9cc/s. |
| 1712 | Isolate pumping station at 4e-5mbar. He background 3.3e-9cc/s |
| 1732 | No gross leak found |
| check the resistances of the detector, everything fine. | |
| 2045 | Raise dewar and pump main bath. |
| 2100 | Fill N2 cold trap full. |
| 2116 | Evacuate IVC, He BG 2.7E-9cc/s. |
| Introduce He gas into main bath up to G3 reads 70 mbar. He signal goes up to 6.2e-9cc/s rapidly and then drops slowly to 4.2e-9cc/s at the time of this entry. This is likely a virtual leak. We will proceed to transfer liquid N2. | |
| 2128 | Evacuate 1K pot line |
| IVC pressure 4.6E-5 mbar. Add 1 mbar N2 exchange gas. | |
| 2145 | Start LN2 transfer. |
| 2230 | Temperature dropping very slowly. Increase pressure of N2 exchange gas to 40 mbar. Increase pressure in dewar. |
| 2310 | Cooling rate improved somewhat, but still not very fast. There is liquid nitrogen in the main bath. Probably alright: it's still going down. |
| 2335 | Start cryocleaning mixture. Valve 6 13.8% open. |
| Mixing chamber temperature 231 K. | |
| 2355 | Level meter resistance 1.32 kΩ. Stop LN2 transfer. |