2011/03/11
Tower Assembly
| 1400 | Audit completed. Return sources to clean room for installation in source holder. |
|---|---|
| Begin tower assembly. | |
| 1430 | One of the modified Schuba extender plugs requires more copper to be shaved off. |
| Take both Schuba extender plugs to mill to shave off an additional 0.6“. Total thickness of copper removed is 0.2“. | |
| 1530 | Schuba extender plugs fit nicely. Continue to assemble tower. |
Tower Level Continuity Check
| 1800 | Perform tower level continuity checks. |
|---|
| Detector | G101 | DIB | 1 | |
|---|---|---|---|---|
| side coax | ZB1-1-9 | date/who: | 2011-03-11 | JZ & RR |
| face | 5 | |||
| +ve lead | -ve lead | signal | measured | |
| 1 | 2 | QET A | 126.3 Ω | |
| 9 | chassis | LED1 Rforward | 799 kΩ | |
| 10 | chassis | LED2 Rforward | open | |
| chassis | 9 | LED1 Rreverse | <1 nS | |
| chassis | 10 | LED2 Rreverse | <1 nS | |
| 1 | 11 | Qo Rbias | 26 nS | |
| 12 | 11 | Qo C coupling | <1 nS | |
| 12 | 13 | Qo Rfeedback | 26 nS | |
| 1 | 14 | Qi Rbias | 26 nS | |
| 15 | 14 | Qi C coupling | <1 nS | |
| 15 | 16 | Qi Rfeedback | 26 nS | |
| Detector | G101 | DIB | 2 | |
|---|---|---|---|---|
| side coax | ZB1-1-6 | date/who: | 2011-03-11 | JZ & RR |
| face | 2 | |||
| +ve lead | -ve lead | signal | measured | |
| 9 | chassis | LED1 Rforward | 787 kΩ | |
| 10 | chassis | LED2 Rforward | 779 kΩ | |
| chassis | 9 | LED1 Rreverse | <1 nS | |
| chassis | 10 | LED2 Rreverse | <1 nS | |
| 1 | 11 | Qo Rbias | 26 nS | |
| 12 | 11 | Qo C coupling | <1 nS | |
| 12 | 13 | Qo Rfeedback | 26 nS | |
| 1 | 14 | Qi Rbias | 26 nS | |
| 15 | 14 | Qi C coupling | <1 nS | |
| 15 | 16 | Qi Rfeedback | 26 nS | |