Table of Contents
2011/03/07
| 1400 | Stop pumping dewar. Pressure 1.2E-4 mbar. |
|---|---|
| 1600 | Fill IVC with 1 bar N2 gas. Open check valve. |
| 1945 | Remove tower from IVC and take to clean room. |
Piecing Together the Source Holder
Crystal Inspection
| Figure 5: Large scratch on electrode side. Initially caught us by surprise, but noticed that this has been documented in detector elog entry 1343. Slight scratch seen 60°-90° to the left of the more prominant one, across outermost electrode. Wire bonds look intact. | |
|---|---|
Tower Assembly
| Figure 7: Remove bottom lid and attach source holder. Cover with bottom lid. Secure with threaded rods (not shown). | |
|---|---|
| Figure 8: Orientation of Schuba extender plugs looks correct on left, but pins miss holes due to lip on tower. | |
|---|---|