UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20110203

2011/02/03

0100 End of run. Start warm up procedure.
Stop circulation. Close needle valve, stop pumping on 1 K pot and drain helium into the main bath.
Equalise pressures on pumping and condenser sides. Close speedivalve from helium trap to condenser to prevent trap from outgassing into the pipes.
0115 Close valves 12A and 12B to the cold traps and pump mixture into dump.