UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20110130

2011/01/30

0015 Increase valve V6 to 14.5%. Tower temperature decreases and pressure in G2 increases to 240 mbar before I decrease V6 to 14%. Pressure in G2 decreases, but tower temperature increases again.
0020 Tower temperature decreasing, pressure in G2 decreasing but still a little high at 208 mbar. This is probably acceptable. Will leave this overnight and see what situation is like tomorrow morning.
1455 Fill N2 cold trap full. Tower temperature 4.5 K.
1530 Open line to cold trap 2. Perhaps this will improve the flow.
1600 Adjust LakeShore Thermometer's resistance range to fix R.Over error.
1745 Temperature starts to drop noticeably faster, cause unknown. Increasing valve V6 gradually.
1845 V6 Fully Opened. Tower Temperature at 165 mK, having fixed the temperature curve setting on the LakeShore Thermometer.
1922 Temperature stabilized at 155.7mK.
2045 G2 pressure 95 mbar and stable. Valve V14 closed to isolate dump as most mixture should be out of there by now. Turn Still on: 5.0 mW. Temperature jumps from 153 mK to 155 mK, and G2 pressure rises to 136 mbar. Wait for a while and see what happens.
2100 Tower temperature increases. No end in sight. Perhaps I turned on Still too early. Turn it off at a tower temperature of 176 mK.
2120 Tower temperature and G2 pressure decreasing.
2140 Tower temperature 155 mK and dropping, G2 pressure 93 mbar.
Plug in DCRC boards.
2235 Fill N2 cold trap full.