UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20110129

2011/01/29

1050 Pressure in G1 and G2 around 45 mbar. Mixture has condensed.
Tower temperature is 6.2 K. Rather high: perhaps this is due to a blockage.
1130 Start LHe transfer. He liquid level 11.2%.
1240 Finish LHe transfer. He liquid level 92.2%.
1325 Fill N2 cold trap full.
1430 Circulate mixture through nitrogen cold trap 1.
1500 Mixture is pumped out very quickly at first. Valve V6 reduced from 20% open to 12%. This helps matters.
1700 Everything fine when increasing in 0.5% increments until we increase valve V6 to 14.5%. Mixture seems to stagnate. Flow is not good. See how things look in a few hours. It could be down to a blockage. Open needle valve further to pump more out of 1 K pot: its temperature is stable at about 1.6 K, 20 mbar pressure in exhaust line.
2200 Flow is poor, pressure in G2 high, but within acceptable range. No improvement, although tower temperature is decreasing.
Call Vuk. Decide that it is safe to leave overnight. See what situation is like in the morning. Reduce valve V6 to 13% for safety.
2330 Something interesting happened. Filled N2 cold trap full, and circulation picked up: G2 reads 97 mbar. Tower temperature increased, probably as a result of warm mixture entering the system. Increase valve V6 to 14%.
2350 Stagnating again. Short-lived joy. Tower temperature still increasing, but looks like it is leveling off.