2010/12/10
| 0116 | Room temperature electrical check before fixing SQUET |
|---|
| Cooldown checkout sheet (rev C SQUET) | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Detector: | G9 | BH: | Stripline: | 19 | |||||||
| SC: | ZB1-4-6 | RT | LN | LHe | |||||||
| Face: | 2 | Date | 2010-12-10 | Date | Date | ||||||
| SQUET: | ZC23 | Who | HC&JZ | Who | Who | HC | |||||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis | Nominal | Actual | Chassis | Nominal | Actual | Chassis |
| (Gnd lead) | (Gnd lead) | (Gnd lead) | |||||||||
| Nominal: | Nominal: | Nominal: | |||||||||
| < 0.1 nS | < 0.1 nS | < 0.1 nS | |||||||||
| Phonon | |||||||||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.4 | OK | 1 - 2 k | ? | ||||
| SQUID bias B/Ret | 19 | 34 | 5 | OK | |||||||
| SQUID bias C/Ret | 8 | 24 | 4.6 | OK | |||||||
| SQUID bias D/Ret | 23 | 39 | 4.3 | OK | |||||||
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 19 | OK | 9 - 13 k | ? | ||||
| Feedback B/Ret | 2 | 18 | 20 | OK | |||||||
| Feedback C/Ret | 41 | 25 | 19 | OK | |||||||
| Feedback D/Ret | 22 | 6 | 18 | OK | |||||||
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 91,100,85,86,86 | OK | 30 - 40 | ? | ||||
| QET B/Ret | 35 | 29, 33, 47, 48 | 87,87,97,87 | OK | |||||||
| QET C/Ret | 7 | 5, 9, 10, 28 | 86,85,74,84 | OK | |||||||
| QET D/Ret | 38 | 36, 40, 43, 44 | 84,84,84,84 | OK | |||||||
| Charge | |||||||||||
| FET heater +/- | 45 | 46 | 1.0 - 1.1 k | 1.068 | OK | 1.0 - 1.1 k | 1.0 - 1.1 k | ||||
| Qi bias/QET Ret | 15 | 24 - 26 nS | 25 | OK | < 1 nS | < 1 nS | |||||
| Qo bias/QET Ret | 11 | 26 | OK | ||||||||
| Qi feedback/Drain/Source | 50 | 16, 31 | 15 - 17 nS | 23,23 | OK | 6 - 8 nS | ? | ||||
| Qo feedback/Drain/Source | 30 | 12, 27 | 23,23 | OK | |||||||
| Qi drain | 16 | chassis | < 0.1 nS | – | OK | < 0.1 nS | – | < 0.1 nS | – | ||
| Qo drain | 12 | chassis | – | OK | – | – | |||||
| Qi source | 31 | chassis | – | OK | – | – | |||||
| Qo source | 27 | chassis | – | OK | – | – | |||||
| FET Tsense +/FET heater- | 49 | 46 | 0.6 - 0.7 V | 0.723 | OK | 0.9 - 1.0 V | ? | ||||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | 1.138 | – | 1.2 - 1.5 V | – | ? | – | ||
| LED 2 | chassis | 26 | 1.126 | – | – | – | |||||
| Cooldown checkout sheet (rev C SQUET) | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Detector: | G8F | BH: | Stripline: | 20 | |||||||
| SC: | ZB1-5-1 | RT | LN | LHe | |||||||
| Face: | 6 | Date | 2010-12-10 | Date | Date | ||||||
| SQUET: | ZC70 | Who | HC & JZ | Who | Who | ||||||
| Signal | Pos. lead | Gnd lead | Nominal | Actual | Chassis | Nominal | Actual | Chassis | Nominal | Actual | Chassis |
| (Gnd lead) | (Gnd lead) | (Gnd lead) | |||||||||
| Nominal: | Nominal: | Nominal: | |||||||||
| < 0.1 nS | < 0.1 nS | < 0.1 nS | |||||||||
| Phonon | |||||||||||
| SQUID bias A/Ret | 4 | 20 | 3 - 5 k | 4.9 | OK | 1 - 2 k | ? | ||||
| SQUID bias B/Ret | 19 | 34 | 4.4 | OK | |||||||
| SQUID bias C/Ret | 8 | 24 | 4.7 | OK | |||||||
| SQUID bias D/Ret | 23 | 39 | 5.2 | OK | |||||||
| Feedback A/Ret | 37 | 21 | 15 - 25 k | 29 | OK | 9 - 13 k | ? | ||||
| Feedback B/Ret | 2 | 18 | 26 | OK | |||||||
| Feedback C/Ret | 41 | 25 | 28 | OK | |||||||
| Feedback D/Ret | 22 | 6 | 35 | OK | |||||||
| QET A/Ret | 3 | 1, 13, 14, 17, 32 | 60 - 80 | 85,83,80,81,80 | OK | 30 - 40 | ? | ||||
| QET B/Ret | 35 | 29, 33, 47, 48 | 78,77,80,78 | OK | |||||||
| QET C/Ret | 7 | 5, 9, 10, 28 | 78,76,69,76 | OK | |||||||
| QET D/Ret | 38 | 36, 40, 43, 44 | 80,80,80,80 | OK | |||||||
| Charge | |||||||||||
| FET heater +/- | 45 | 46 | 1.0 - 1.1 k | 1.061 | OK | 1.0 - 1.1 k | 1.0 - 1.1 k | ||||
| Qi bias/QET Ret | 15 | 24 - 26 nS | 25 | OK | < 1 nS | < 1 nS | |||||
| Qo bias/QET Ret | 11 | 25 | OK | ||||||||
| Qi feedback/Drain/Source | 50 | 16, 31 | 15 - 17 nS | 23,23 | OK | 6 - 8 nS | ? | ||||
| Qo feedback/Drain/Source | 30 | 12, 27 | 23,23 | OK | |||||||
| Qi drain | 16 | chassis | < 0.1 nS | – | OK | < 0.1 nS | – | < 0.1 nS | – | ||
| Qo drain | 12 | chassis | – | OK | – | – | |||||
| Qi source | 31 | chassis | – | OK | – | – | |||||
| Qo source | 27 | chassis | – | OK | – | – | |||||
| FET Tsense +/FET heater- | 49 | 46 | 0.6 - 0.7 V | open | OK | 0.9 - 1.0 V | ? | ||||
| LED 1 | chassis | 42 | 1.0 - 1.1 V | 1.155 | – | 1.2 - 1.5 V | – | ? | – | ||
| LED 2 | chassis | 26 | 1.149 | – | – | – | |||||
| 0434 | Start pumping IVC |
|---|---|
| 1427 | IVC pressure 4.6E-5 mbar. Electrical checks are OK under vacuum. |
| 1445 | Tightened all the In seal again. |
| 1446 | IVC He signal 4.7E-10cc/s with the pumping station on. Isolate the leak checker, He BG 4.4E-10cc/s. The leak checker is contaminated, need to regenerate it. The background is still low enough to do a leak check. |
| 1453 | Isolated pumping station. IVC He background rose to 2.3E-9cc/s. |
| 1503 | Spray He around top In seal |
| No leak found at the BG level 2.4E-9cc/s. | |
| The computer clock is 5 min faster. Adjust the clock to standard time. | |
| 1507 | Spry He around the wire tune In seal and IVC middle In seal |
| 1512 | No leak found at the BG level 2.4E-9cc/s |
| 1514 | Spry He around the IVC bottom In seal |
| 1517 | No leak found at BG level 2.4E-9 cc/s |
| 1717 | Raise the Dewar |
| 1742 | Fill N2 cold trap full |
| 1817 | Pump and flush Dewar. He rises to 1E-6cc/s when filling He and then drops to 1E-8cc/s when bath is filled with He gas. |
| Pump the He gas in the bath out, leak signal rises while pumping | |
| Fill bath with He gas again, He signal rises to 1E-6 and drops to 1E-8cc/s | |
| 1830 | Spray He around fridge top, wire tube quick coupling, pumping manifold joints at 7E-9cc/s |
| 1835 | He signal rises to 7.9E-9cc/s slowly and then starts to drop. |
| 1837 | Pump the bath, He signal rise to 5E-7cc/s in one minute and then starts to drop slowly |
| 1840 | Stop pumping the bath. He signal stays at 1.2E-7 momentarily and then starts to rise slowly |
| 1853 | He signal 5.1E-7cc/s, still going up slowly |
| 1856 | Fill bath with He gas to -15in Hg pressure, He signal rises to 2.1E-6cc/s and then drops |
| 1900 | He signal 1.2E-6cc/s and roughly stabilizes at pressure -15in Hg. |
| 1907 | Fill bath to -9in Hg He gas. He signal drops from 1.2E-6cc/s. |
| 1909 | He signal drops to 1E-7cc/s |
| 1911 | Fill the bath to -4in of Hg, He signal drops |
| 1914 | He signal stays roughly at 2.4E-8cc/s |
| 1916 | Pump the bath to -12in of Hg. He signal rises slightly to 2.8E-8cc/s |
| 1918 | Pump the bath to -20in Hg, He signal rises raptly |
| 1920 | He signal stays roughly 5.7E-7cc/s and rise again |
| 1924 | He signal plateaus at 1e-6cc/s |
| 1926 | Pump the bath to -24in Hg |
| 1935 | He signal roughly plateaus at 2.2E-6cc/s. |
| 2006 | Over pressure bath and then open to air to put it at 1 atm. Close vent speedivalve. Evacuate 1K pot line and V2A and V5A. |
| 2008 | He signal drops to 2.5E-8 cc/s |
| 2047 | Leak 9.1E-9cc/s |
| Cryoclean the mixture |