| 0933 | Turn off DCRC and see if it changes tower temperature |
| | Tower temperature went up and then dropped to 75.4 mK. There seemed a larger heat load on the tower and the mixing chamber. This might be due to the Helium leak. I'll try pumping the IVC. |
| 0951 | Turn on the pump and the leak checker |
| | Evacuate the hose using the leak checker |
| | Connect the pumping station, isolate the leak checker |
| 1014 | Try to open IVC at 6.3E-6mbar. Pressure drops to 5.4E-6mbar after opening the IVC a little bit. The IVC pressure is lower than the hose. Wait for a bit more |
| 1546 | Tower temperature has risen to 93.2 mK. |
| | Tried to lock down B1 with no success due to high temperature. A1 has higher Tc, so was locked down instead: saw pulses. |
| 1736 | Try our switch. Replaced bad power cable to one PoE box. Had trouble reading waveforms from DCRCv3-33: problem seemed to rectify itself after restarting LabView. |
| | Start evacuating IVC at 6.3E-7 mbar. Tower temperature is 95.9 mK. |
| 1832 | Tower temperature is 98.7 mK. Take phonon noise spectra. |
| 1900 | Zap all 4 channels on DCRCv3-30 for a few seconds. Tower temperature rose to 310 mK, then dropped to 115 mK. Still going down, albeit slowly. Take phonon noise spectra of these four channels (A2-D2). |
| 2017 | Zap all 4 channels on DCRCv3-33 for a few seconds. Tower temperature soared to 290 mK, then dropped to ? mK. Still going down, slowly like a snail. Take phonon noise spectra of these four channels (A1-D1). |
| 2229 | Take series 07101123_2223. DIB1 -1V, DIB2 +1V. Trigger 400ADC both sides. Tower T=118mK, 50K events |
| 2252 | Take series 07101123_2252. DIB1 -2V, DIB2 +2V. Trigger 400ADC both sides. Tower T=118mK |
| 2320 | Take series 07101123_2320. DIB1 -0.5V, DIB2 +0.5V, Trigger 400ADC both sides. Tower T=119mK |
| 2337 | Fill N2 cold trap full |