| 0940 | Fill N2 cold trap full |
| 0943 | Close gate valve, condenser speedivalve, V1, and V6 to isolate the fridge |
| 0945 | Start to pump the bath |
| 0947 | Isolate the pumping station and the vacuum gauge on it |
| | IVC He BG 2.1E-9 cc/s |
| 0951 | Fill the bath with He gas, IVC He signal start to rise |
| 0954 | Stop He gas at G3=63mbar, IVC leak: 7.3E-9 cc/s |
| 0955 | IVC leak peak value: 7.3E-9 cc/s, starts to drop |
| | Start to cleaning mixture |
| 1010 | IVC He signal keeps dropping slowly, 3.5E-9cc/s at the moment at G3=31mbar |
| 1013 | IVC He signal 3.2E-9 cc/s, at G3=28mbar |
| 1015 | Isolate bath, evacuate 1K pot line |
| 1016 | Evacuate and isolate 1K pot |
| 1026 | Put 0.16 mbar N2 exchange gas into IVC (1.4mbar in NW40 hose) |
| 1032 | Remove He recovery line, start liquid N2 transfer |
| 1349 | Stop liquid N2 transfer at resistor=1343Ω, put on ping pong ball |