UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20100811

2010/08/11

Run diary

0935 Stop pumping the dewar at 7.4E-5 mbar
1301 Put on SQUET card, electrical check at RT
Cooldown checkout sheet (rev C SQUET)
Detector: G41 BH:
SC: 1 RT LN
Face: 5 Date 2010-08-11 Date 2010-08-12
SQUET: ZC15 Who HC & JZ Who JZ
Signal Pos. lead Gnd lead Nominal Actual Chassis Nominal Actual Chassis
(Gnd lead) (Gnd lead)
Nominal: Nominal:
< 0.1 nS < 0.1 nS
Phonon
SQUID bias A/Ret 4 20 3 - 5 k 5 OK 1 - 2 k 2 OK
SQUID bias B/Ret 19 34 4.6 OK 1.7 OK
SQUID bias C/Ret 8 24 4.2 OK 1.5 OK
SQUID bias D/Ret 23 39 4.1 OK 1.5 OK
Feedback A/Ret 37 21 15 - 25 k 21 OK 9 - 13 k 8.4 OK
Feedback B/Ret 2 18 19 OK 7.4 OK
Feedback C/Ret 41 25 18 OK 7 OK
Feedback D/Ret 22 6 17 OK 6.8 OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 88,74,71,71,71 OK 30 - 40 53,39,36,37,36 OK
QET B/Ret 35 29, 33, 47, 48 72,71,75,72 OK 37,37,40,37 OK
QET C/Ret 7 5, 9, 10, 28 70,68,61,68 OK 36,34,27,34 OK
QET D/Ret 38 36, 40, 43, 44 70,69,69,69 OK 36,36,35,36 OK
Charge
FET heater +/- 45 46 1.0 - 1.1 k 1.064 OK 1.0 - 1.1 k 1.053 OK
Qi bias/QET Ret 15 24 - 26 nS 38M OK < 1 nS OK OK
Qo bias/QET Ret 11 38M OK OK OK
Qi feedback/Drain/Source 50 16, 31 15 - 17 nS 43M, 43M OK 6 - 8 nS 49M, 49M OK
Qo feedback/Drain/Source 30 12, 27 43M, 43M OK 48M, 48M OK
Qi drain 16 chassis < 0.1 nS – OK < 0.1 nS – OK
Qo drain 12 chassis – OK – OK
Qi source 31 chassis – OK – OK
Qo source 27 chassis – OK – OK
FET Tsense +/FET heater- 49 46 0.6 - 0.7 V 0.709 OK 0.9 - 1.0 V 1.082 OK
LED 1 42 chassis 1.0 - 1.1 V 1.133 – 1.2 - 1.5 V 1.414 –
LED 2 26 chassis 1.125 – 1.405 –
Found at least 1 hole at the 100mK can flange, two holes on the 4K tower face stripped.
1446 Start pumping IVC
1552 IVC pressure: 8.6E-2 mbar
1853 Fill N2 cold trap full
1919 Cryoclean mixture, evacuate he gas supply line, pump the main bath
1929 Fill main bath with He gas, no gross leak found at BG 1.4E-6 while pumping station is connected.
1933 Evacuate and isolate 1K pot
1938 start transferring liquid N2, close IVC, put in IVC 0.4 mbar N2 exchange gas (3.4 mbar in NW40 hose)
2229 Stop liquid N2 transfer, put on ping pong ball