UMN CDMS Wiki archive
start › cdms › k100 › run_diary › 20100810

2010/08/10

0924 Vent IVC with N2
Check H35 resistance, all OK
Check Stripline 19 to ground resistance, all OK
1130 Remove the tower from the fridge and take it to the clean room
Replace the Cu tape in Am-241 source with Al tape. Could not take the source out of the other holder, put it back to safe
Put G41 and the Am-241 source and the tower together and do electrical check

G41 electrical check at UCB: http://cdms.berkeley.edu/cdms_restricted/elog/RunDiary/696

Detector G41 DIB2
side coax 1 date/who: 2010/08/10 JZ
face 5
+lead - lead signal typical measured
1 2 QET A 100 to 200 138
1 3 QETA-B 100 to 200 221
3 4 QET B 100 to 200 143
3 5 QETB-C 100 to 200 277
5 6 QET C 100 to 200 249
5 7 QETC-D 100 to 200 297
7 8 QET D 100 to 200 160
7 1 QETD-A 100 to 200 248
9 chassis LED1 Rforward 9M 12M
chassis 9 LED1 Rreverse <1nS OK
10 chassis LED2 Rforward 9M 12M
chassis 10 LED2 Rreverse <1nS OK
1 11 Qo Rbias 24nS to 26nS 47MOhm
11 12 Qo C coupling <1nS OK
12 13 Qo Rfeedback 24nS to 26nS 47MOhm
1 13 <1nS OK
1 14 24nS to 26nS 48MOhm
14 15 Qi C coupling <1nS OK
15 16 Qi Rfeedback 24nS to 26nS 47MOhm
Short to chassis All signal except LEDs <1nS OK
No In wire in the lab, postpone tower installation until tomorrow, put tower in the N2 purging cabinet
1950 Pump the dewar overnight