| 15:52 | Fill N2 cold trap full. Isolate pumping station at IVC pressure 7.4E-6 mbar. |
| 16:02 | IVC He background 2.4E-9 cc/s |
| 16:06 | Evacuate clear hose to IGH rear panel and fill with He gas |
| 16:08 | Pump He bath |
| | Stop pumping on the bath at P2 = 1 mbar |
| | Fill the bath with He gas and leak check |
| 16:27 | IVC leak: 8E-9 cc/s |
| 16:33 | Evacuate 1K pot, close IVC, turn off pumping station and leak checker |
| | Put in IVC 2.5 mbar N2 exchange gas (was 25 mbar in the NW40 hose) |
| 17:04 | Start transfer liquid N2 |
| 19:13 | Stop transfer liquid N2, pump mixture into dump |