2010/04/30

Cooldown checkout sheet (rev C SQUET)
Detector: G9 BH:
SC: Z13 1-6 RT LN
Face: 5 Date 2010-04-30 Date 2010-05-03
SQUET: ZC15 Who JZ Who JZ
Signal Pos. lead Gnd lead Nominal Actual Chassis Nominal Actual Chassis
(Gnd lead) (Gnd lead)
Nominal: Nominal:
< 0.1 nS < 0.1 nS
Phonon
SQUID bias A/Ret 4 20 3 - 5 k 5 OK 1 - 2 k 2 OK
SQUID bias B/Ret 19 34 4.6 OK 1.7 OK
SQUID bias C/Ret 8 24 4.2 OK 1.5 OK
SQUID bias D/Ret 23 39 4.1 OK 1.5 OK
Feedback A/Ret 37 21 15 - 25 k 21.1 OK 9 - 13 k 8.4 OK
Feedback B/Ret 2 18 18.7 OK 7.4 OK
Feedback C/Ret 41 25 17.7 OK 7 OK
Feedback D/Ret 22 6 17.4 OK 6.8 OK
QET A/Ret 3 1, 13, 14, 17, 32 60 - 80 73.8, 72.3, 69.7, 70.1, 69.6 OK 30 - 40 37.6, 37.2, 34.4, 34.9, 34.6 OK
QET B/Ret 35 29, 33, 47, 48 69.6, 69.6, 70.8, 69.9 OK 34.7, 34.6, 35.7, 34.7 OK
QET C/Ret 7 5, 9, 10, 28 68.2, 68.2, 61.0, 68.1 OK 33.7, 33.6, 26.7, 33.4 OK
QET D/Ret 38 36, 40, 43, 44 68.3, 68.5, 68.3, 68.5 OK 34.7, 34.7, 34.4, 34.6 OK
Charge
FET heater +/- 45 46 1.0 - 1.1 k 1.1k OK 1.0 - 1.1 k 1.053 OK
Qi bias/QET Ret 15 24 - 26 nS 38.3MOhm OK < 1 nS OK OK
Qo bias/QET Ret 11 38.1MOhm OK OK OK
Qi feedback/Drain/Source 50 16, 31 15 - 17 nS 42.9MOhm, 42.9MOhm OK 6 - 8 nS 48.5MOhm, 48.6MOhm OK
Qo feedback/Drain/Source 30 12, 27 42.6MOhm, 42.6MOhm OK 48.6MOhm, 48.5MOhm OK
Qi drain 16 chassis < 0.1 nS – OK < 0.1 nS – OK
Qo drain 12 chassis – OK – OK
Qi source 31 chassis – OK – OK
Qo source 27 chassis – OK – OK
FET Tsense +/FET heater- 49 46 0.6 - 0.7 V 0.711 OK 0.9 - 1.0 V 1.08 OK
LED 1 chassis 42 1.0 - 1.1 V 1.132 – 1.2 - 1.5 V 1.5 –
LED 2 chassis 26 1.123 – 1.5 –
10:32 Start He3 and He4 pump, pump mixture into dump
11:13 Close gate valve, condenser speedivalve, V1, and V6
11:25 Fill N2 cold trap full, warming up leak checker
11:27 Close V9, Open V4, V12B, V13B to cool the mixture
11:32 Open V14, open V6 to 13.2%
11:37 Close and open V13B to see if there is mixture passing through V6
11:39 Increase V6 to 13.5%, clean the mixture
17:02 At 1.2×10-5 mbar isolate pumping station and check the background He level
17:06 IVC background He level: 7.2×10-10 cc/s