2010/02/23
Run diary
| Time | |
| 10:00 | Fill N2 cold trap full |
| 10:20 | Zap SQUIDs. |
| 10:36 | Set MC power be 0. |
| SQUID settings |
| Channel | SQUID Bias (uA) | Lock point (mV) | Frontend gain |
| A | 95 | 3.6 | 7 |
| B | 100 | 3.4 | 7 |
| C | 92 | 3.2 | 7 |
| D | 95 | 3.5 | 7 |
| Closed loop response |
 |
| Time | |
| 22:32 | Transfer LHe |
| 24:00 | Fill N2 cold trap full |