| Teleconference link: | https://umn.zoom.us/j/9024497080?omn=95322888432 |
| Meeting ID: | 902 449 7080 |
| Domestic: | 1-408-638-0968 (US toll) |
| Access code: |
- Lab Update
- Tried opening needle valve 5 turns, but pumping pressure was below 3 mbar. There is definitely a clog.
- Prof. Paul suggested to do a clog test after LN2 blowout step before doing LHe transfers next time.
- Opening the needle valve completely will let air into that port. Instead we will pressurize the 1Kpot with pure He and do sniff test at needle valve for leaks.
- Main Bath is now empty and I will start a warm up process this afternoon.
- Priority Updates
- General Updates
- Himangshu
- Shubham
- Zach
- Elliott
- Scott