| Teleconference link: | https://umn.zoom.us/j/9024497080?omn=98454621599 |
| Meeting ID: | 902 449 7080 |
| Domestic: | 1-408-638-0968 (US toll) |
| Access code: |
- Lab Update
- He test on circulation line:
- Added 200 mbar He through vent port into condenser side and Still side. No change in IVC leak detector readings in 10e-10 mbar L/s.
- Pumped out with scroll pump, but gauge value didnt change.
- Turbo pump repair:
- Using manual, open the turbo base plate and replaced roughing pump.
- Initial start seem to failing to go below 1e-3 mbar
- Kept it running over weekend. Yesterday, pressure is stable and below 1e-5 mbar, as expected.
- IVC is pumped out overnight. Plan is to do electrical checks and raise Main Bath.
- Priority Updates
- General Updates
- Himangshu
- Shubham
- Zach
- Elliott
- Scott


