UMN CDMS Wiki archive
start › cdms › k100 › group_meetings › 20250206
Teleconference link: https://umn.zoom.us/j/9024497080?omn=98454621599
Meeting ID: 902 449 7080
Domestic: 1-408-638-0968 (US toll)
Access code:
  • Lab Update - Run 82 on-going
    • Leak checker show 1e-1 mbar L/s which is one order higher when we left pumping after adding exchange gas.
    • Pumped out the IVC again to prepare to add He gas to 1K pot.
    • Added 1 mbar, then 10 mbar He gas to 1Kpot, needle valve closed. No change in leak detector. Either no leak or leak is lowered than current background level.
    • To check Main Bath to IVC for leaks, added two tubelengths of exchange gas to IVC and one tubelength to CVJ. Expected to see heating, but the overall temperature dropped a little overnight, Main Bath is not completely empty.
  • Priority Updates
  • General Updates
    • Himangshu
    • Shubham
    • Zach
    • Elliott
    • Scott